Frequently asked questions
1. How can Altbath renovate a bathroom in one day?
Thanks to our patented construction system, you can have a complete bathroom installed in just one working day. This process relies on a highly planned and programmed method for each construction phase.
2. How does Altbath differ from other systems?
The main difference is based on planning, speed of execution and control of the entire process. While traditional construction usually involves long construction periods, constant unforeseen events, difficult deadlines and cost overruns, at Altbath we offer a highly planned system with very precise real-time schedules.
Thanks to our approach and working method, execution is much faster and cleaner, minimizing inconvenience and avoiding prolonged closures of establishments. This system also allows us to achieve great control of incidents, drastically reducing the margins of error.
3. What advantages does Altbath offer for maintaining the hotel's normal operations during renovations?
The Altbath system is designed to minimize disruption to the hotel’s daily operations. For this reason, planning and transparent and constant communication with the client is essential throughout the process. Thanks to our working method and a fast and clean system, the noise, dust or waste generated is significantly reduced, minimizing possible inconvenience to guests.
4. How are the designs adapted to the aesthetic and functional needs of each hotel?
At Altbath, we fully adapt to the materials and requirements specified by the property and its decorators. We have personalized solutions that meet the specific needs of each client, including the rigorous standards of higher-category establishments.
In addition, our constructions are compatible with all brands of faucets and sanitary ware, facilitating the availability of a wide variety of materials and qualities to achieve the desired design.
5. How is the budget for a renovation managed?
At Altbath we carry out a thorough preliminary study to understand exactly what the client needs and what is the best solution for each specific case. Before presenting a quote, the technical team analyses the characteristics of the space, the needs of the establishment and the most suitable materials to guarantee an optimal solution.
Thanks to this preliminary analysis work, the quote delivered to the client is fully adjusted to the real need of the project. There are no generic items or unnecessary overloads: what is budgeted from the beginning is exactly what will be executed. This means that the initial price is the final price, without surprises or unforeseen additional costs.
6. What type of maintenance do bathrooms installed by Altbath require?
Altbath baths are designed to be long-lasting and easy to maintain. The materials used are resistant and of high quality, guaranteeing a long useful life. In addition, the system allows the replacement of parts in a simple way, facilitating maintenance and repair tasks without the need for additional work.
7. Does Altbath offer solutions for other areas of the hotel?
Yes, Altbath also provides solutions for the renovation and construction of other areas of the hotel such as rooms or common spaces and also for other types of accommodation.
